We did it! We finally finished the outside walls today. Here is a couple of pic's of the finished project. Tomorrow our goal is to get the barn water pipe fixed. Start getting the sides of the basement walls ready. Tomorrow night we get the use of a bobcat so we can finish putting back some of the dirt. The rest of the dirt & clay will go to a farm neighbor. What a huge blessing for us to not worry about what to do with all the extra dirt & clay. We are still praying away rain. Still waiting to hear on the trusses. It would be nice if they came Wednesday but only time will tell.
Monday, June 23, 2008
A weekend update
My dear father-in-law would like an update so here it is......
We were overwhelmed with the amount of people who came and helped Saturday. We had a family from church (Dad, 2 older sons), my bro, the first lumber company driver, a close friend, another family from church (Dad, 2 sons) and our family. Plus they brought out their families. Only a couple of them stayed for supper that night. That day we were able to get 90% of the flooring down, siding off the side of the house that we are attaching to, and the beam by the house was accomplished.

On Sunday, after church, we were able to get 5 sections of walls nailed together before the rain hit. We are keeping them down until we get all the sections nailed together and then we will put them up.
Dave called the lumber company to get some spec's on the patio doors we are installing. He inquired about the trusses as to when they are coming. The lumber company said that the truss guy was coming in and he would ask. We are hoping somewhere near the end of the week. That will give us enough time to get the walls done and up.
Will post more later and when I have time I'll upload more pictures to photo bucket.
Saturday, June 21, 2008
Finishing flooring and waiting for framing lumber
We are finishing up the flooring this morning. We had rain come yesterday so we quit. Plus we were getting tired. What seemed like it should of went fast actually went slower. By last night both Dave and I felt like not much was accomplished. We did get a lot done but felt like more should have been done. We did have a light rain. We are thankful for that. So far this morning we had a sprinkle.



We are waiting for our framing lumber to arrive. Hopefully by the time we get the flooring done the lumber will be here. Then comes the fun part of framing. Our roof trusses should be done by now. Our lumber guy said that they have opened up the road ways from Iowa to move oversized loads. So our trusses should be here next week. We hope to have the framing done by the time we get the trusses so they can go straight up and not have to sit on the ground.
In just 12 days we went from this......
To this.....
These were taken this morning.
Also for those who have the link to photo's online I uploaded more this morning. They are under the folder, on the left side, "flooring". There is about 400 new pictures in there. Also the hole you see in the flooring is where the stairs are going to be. Those stairs will lead to the basement.
Any questions? Just so know, you can post comments or questions :) after the posts.
Will post more later.......
Friday, June 20, 2008
More Friday stories.....
Let's just say it's going to be one of those days :)
Even though things are not going right we are still moving forward. We get 1/2 of the I-beams up only to find a mistake. For some reason due to miscommunication between us and the lumber yard we are now short some boards. The plan was for the 2 support beams to be at 16ft and the drawn up plan was for 14ft. So that makes a big difference when you put up the beams! We needed to have another 8-32ft I-beams delivered so we could finish the project. While this is going on our oldest son calls from work to say he has hurt his back. He is going to the dr. Then our 2nd oldest son comes home around noon to say HE hurt his back also!!! *Just keep movin, just keep movin!" So the lumber company delivers the I-beams and my 2nd oldest is still helping even though he is in some pain. I hope we get some people to come out tomorrow as we are going to need the extra help.
We should have the floor done by tonight. It's now the hottest part of the day and the hardest part to work. But the children are still moving and so is my husband. Tomorrow we are planning on the start of the framing!! :) That will be a challenge in my eyes. Making sure the walls go up like they are supposed to. Like I said in an earlier post it's like putting together a big jigsaw puzzle.
Friday's happenings
Yesterday we got quite a bit done. We were able to get the 2 main support beams up and was able to get the ledge of the concrete ready for the I-beams. We were able to get up 1 I-beam before we quit for softball.
I guess I should tell you how our day started out. We went outside to move the load that was dropped off the night before. We knew we were going to get more lumber but there wasn't enough room for the driver to turn around in our driveway. So we were moving lumber and yep, here comes the lumber yard truck at 7:15 am. So this driver pulls in our driveway only to find out he doesn't have room to turn around. He thought he would pull towards our backyard and back up. Well he decided while he was doing that that he would just go through the backyard as it *shouldn't* be a problem turning around out there. Sigh...... now we have a lumber truck stuck in our backyard. The problem is it's a flatbed truck with a gooseneck trailer on the back. The heaviest part of the load was on the end of the trailer putting all the weight in back and nothing over the wheels. So our 2nd oldest son takes his 1986 Ford 4-wheel drive truck out there to help pull him. After lots of smoking wheels we decide to let him just dump the load out there and we will worry about it later. He pulls back into our driveway. At the same time our concrete guys are coming to get stuff off their trailers. We asked if they could move the one trailer so the lumber company could turn around with their trucks. They said not a problem. They are planning on getting their trailers out of here next week. That will be helpful as it will give us more room.
So the lumber driver gets out and starts talking with us about our new addition. It's amazing how many people comment on the size of our addition. Then they hear why and completely understand. I told this driver he came too early as we didn't have cookies ready for him but he did take a pop instead. He is a really nice guy and felt so bad for what happened. There's more to that story but will post another time :)
Wednesday, June 18, 2008
Today we start receiving lumber!
Today will start a busy time for us as we put together a big jigsaw puzzle. How else would you describe getting a bunch of lumber and putting it together? This afternoon we will be receiving the floor trusses and support beam. We went into the lumber company to look at a window and patio doors that we needed to order. We got everything squared away. He said the first load should be out this afternoon. Not only will the trusses be on this truck but so will all the OSB boards we need for the project. The next shipments they receive of new material the prices will be higher. Just like the roofing costs are going up about 35% in the next couple of months!! It's about a $20 increase per bundle. We ordered all our roofing material today and they will hold it for us at the current prices. We are saving about $880.00 by getting it today vs in a month or more from now. I guess the felt that goes under it will double in price in the next few months! Absolutely crazy! That is just ridiculous!!
Tuesday, June 17, 2008
Now the wood
Next part of this construction will be long as we are doing most of the work ourselves. We will end up with people helping us. We are not planning on hiring out unless we get into trouble. The wood will either come today or tomorrow. We are waiting to hear from the lumber company. We have been very pleased with this lumber company. They will deliver what we need when we need it and they don't charge for delivery!!! The guy we have been working with has been great at making sure we get what we need and letting us know of price increases that are upcoming on what we are buying. He used to work at many yards and now works for this company. He is a great guy to work with.
Next step will be putting the beams and support in. That hopefully won't take long. We are guessing it might take a day or two to get that done. Next part will take awhile as that part will be the framing. I said earlier that our trusses were done. Actually they will be done by the end of this week but they can't ship them until Iowa gives the clear for oversized loads to be moved. That should be about 10 days.
That's it for today! We are enjoying a slow work pace as we know once everything starts getting delivered will be working hard.
Monday, June 16, 2008
Basement finished!
Today the foundation crew was here to finish the crawl space. They put a 3" slush coat for the floor of the crawl space. It looked just like the basement floor when it was poured but what I'm noticing is it is not drying as fast as the basement did. They took most of their equipment today. There is still 2 trailers left. I'm guessing they will be back tomorrow to pick up the trailers and talk with Dave.
Dave called the lumber company today to find out when they will start delivering the wood. They said it could be as early as tomorrow afternoon or the latest Wednesday. They also said our trusses are done but they can't deliver them. The trusses are coming from Iowa and Iowa is not allowing oversized loads to be moved. He said we should have our trusses in about 10 days. Yikes! I'm not sure I'm ready to move that fast!! Also the lumber company said they are trying to get our OSB boards before the price goes up. That is due to the flooding everywhere. So good news all around.
Thought I would post an update on the 13 yr old girl that I asked you to pray for. I received a note in the mail today from her mom. The note read "Thank you for praying and caring about *C*. We got her lab results back today and all her numbers are up the highest they ever have been. Thank You *Mom*" How great is that to hear!!!!!! Thank you for praying for her but keep up the prayers. They still need answer as to what is going on and what the next step is. They have been in limbo way to long. Thank you!
I'm trying a new internet site for the pictures. As soon as I get them all up and loaded on the site I will send out an email.
Saturday, June 14, 2008
It's almost done!
Today they were here by 7:40 am. The owner said that the cement trucks would be here around 8 am. Sure enough, at exactly 8 am the cement trucks start rolling in. Today they only needed 3 cement trucks to do the whole floor. Yes I did get pics but I have a dead camera as both batteries are now dead. They also starting prepping the crawl space for Monday's adventure.
In the crawl space they added some rebar. They dug around the rebar to create a cement pad for the floor beams. They also added some rock and put some dirt back against outside wall. After that they took a machine down to the basement floor. Then they used that to smooth out the floor. It looks really nice. They left here at 1 pm. They are planning on being back on Monday after dinner (lunch time to those city folks) to finish the crawl space. Then we should be done with that project.
As of right now we should be getting the floor beams on Tuesday. Then we start the construction. From that point on we will be doing the work. We are hoping to create 2 workday Saturdays in which we will invite people who will help us build. An old fashion barn (house) raising.
Friday's Accomplishments
Dave had to work today so that left me in charge with dealing with the foundation guys. Not a problem as Dave kept in contact with me most of the day. Today they came and took down the wall forms. That was a pretty big job and those forms are heavy. It took awhile to get them all down and loaded back on the trailer. The foundation owner brought in 4 trailers loaded with what was needed to get the job done. The scraped off the extra cement. I talked with the owner who informed me that they would be back Saturday to put in the floor and Monday to finish the crawl space. Okay, not a problem!
During the day they got the floor ready by adding rock, then a clear type plastic (which covered the whole floor) and then they put down a wire mesh on top of that. They did put down some rock to hold the plastic in place. After the floor was ready then they sealed the outside of the basement. They were gone by 3 pm.
Friday, June 13, 2008
Thursday's Accomplishments
Thursday's weather didn't look the greatest. You could see off in the distance dark clouds moving north east. They were not sure they would be able to pour the walls due to the impending rain. I kept praying the rain would stay away while they did the work.
They were here by 8 am. They took off the forms off the footings. Next the wall forms went up without any problems. They did a lot of bracing. Making sure each wall was straight. This was done by noon and then came the cement trucks. Took 4 trucks to fill all the wall forms. They sprayed the inside of the forms with an oil so the cement wouldn't stick to them. By 3 pm they had all the concrete put in place and were done for the day.
We were able to make it to baseball on time. When we were on our way home we could see in the distance lightening. Lots of lightening. We were under a tornado watch till 2 am. We finally got hit around midnight. The winds were horrible! Not sure exactly what time the rain ended but we did lose power for about 2 hours. You are wondering what the big deal is?? Well where you used to go down into the basement on the outside.... there is no door, no blockage of any kind! It's wide open to the elements of the world. Plus the crawl is about 1/3 up the door way area. We were blessed that we only got about 1" of rain that night. We did have some mud flow into that area but not alot. We were blessed it didn't flood. We did have a cat come up through the basement stairs into the inside of the house.
We did lose some shingles on our roof. We lost 1/3 of our cherry tree (which this year was loaded with cherries!!!). We have tree debris about 1/4 mile down the road from our trees in the front of our house. We had 2 sections of fencing go down. Other than that we faired well.
Tomorrow the foundation guys are planning on taking down the forms.
Wednesday, June 11, 2008
Another accomplishment today
Well today was busy here. The excavating is done! Now the foundation group is here. They were able to pour the footings in by 5pm. As of 8pm 90% of the cement is hard! That is amazing. But it was hard enough when a turkey found it's way ON the footings!! We have turkey tracks on the footings.
Yesterday we had to repair our sewer pipe and today it was a water pipe. Now you would *think!* that when you put in a shut off valve outside it would run to the barn, right? Wrong! As the excavator was digging the basement part of the foundation we found the water line that ran to the barn. So my husband turned off the circuit breaker to the well. We bought a street key to turn off the water outside the house at this valve. We turn on the breaker only to find that the water is still running through the cut pipe. So off goes the breaker. We had no water from 10am till 8pm tonight. I can finally say we have water. Well at first we didn't. Dave fixed the pipe outside and the water ran to the barn. He told me to turn on the house faucets to get the air out. I turn on all the faucets to only find that there is no water and no air coming through. He goes out to the shut off valve we turned off, thinking it was for the barn, and on goes the water in the house!!! Such a weird set up!!! Now we know there is no shut off to the barn and will have to add one in before we put back all the dirt to the foundation.
The youngest daughter who cut her knee is doing well today. We kept her off her leg so she wouldn't split it open. I'm hoping tomorrow she will be back to normal.
Tomorrow's agenda....
Our foundation crew is coming to take down the forms for the footings, put up the forms for the walls and pour walls! All that will only happen IF it doesn't rain. I prayed earlier that the rain wouldn't hit and that happened! Now to pray away tomorrow's rain so we can get the walls up. I'm thinking that Friday they will pour the floor of the basement and we will be done with them. Then the fun starts :) We will have to seal coat the basement and get the lumber delivered. If all goes well in the next couple of days we can start doing lumber early next week. We shall see how all that plays out though. Things can change.
This whole project went from thought process to working progress in a matter of days! It went from last week to changing the style of house from 2 floors to a single floor type ranch. To submitting our plans to the lumber yard. Then the foundation crew said it would be late this week before he could even begin only to switch gears to * as soon as it's dug, call me!* It's amazing what has been accomplished in just 2 days. I hope and pray that the rest of the house will go up in the same manner.
This is what we are hoping for
The picture below is what our addition will look like. This does not have any existing house in this picture. We are basically adding a whole new house. The top part of the picture is where it will connect with the existing house. The open right corner will be open to our kitchen. The top left room will be our laundry room. The next room down is a full size bathroom. Then there is 2 bedrooms and a unknown room. On the right side will be our dining room, living room. Then a guest bedroom/study room. Then stairs that will lead down to our basement. Then the bottom 2 rooms are bedrooms.
Day 2 of excavating.....
It's 6:30am and he is working at digging the full basement. We are hoping he will complete this by early morning so he can get to a dr's appt with his daughter up in Madison, WI. Pray for this young 13r old girl. They can not find what is wrong with her since October. She keeps losing blood and no idea why :(
Tuesday, June 10, 2008
Excavating!
Today was day 1 in the excavating department. He was able to get here early but due to some mechanical problems on the truck he didn't get started sooner. We were able to get the crawl space almost done today. Seems where we thought the sewer pipe came out of the house was not the right one. Yep you guessed it. They hit it! So no bathrooms or washing of any kind was allowed in the house. We ended up sending the children over to our neighbor's house for supper and baths. That was a big blessing!
After having Dave run to a local lumber supply company and our oldest son running to 2 other supply companies we had to run 45 mins away to get the right pipe. At this moment Dave is putting together the pipe so we have can water and bathrooms tomorrow :)
Tomorrow the excavator is coming back at 6am to finish the job. It will be an early day for our family. Hopefully the children will sleep through it all. The foundation forms should be arriving tomorrow and hopefully put up in place. The foundation guy was planning on pouring on Thursday. That will only happen IF it doesn't rain. As of right now they are calling for a 70% chance on Thursday and 40% chance on Friday.
I will put up pic's tomorrow when I'm not so tired. Plus, on top of this, our youngest daughter has a 1.5" slice in her knee as of tonight. Pray that it will heal without stitches.
Saturday, June 7, 2008
Just in one day......
This is what happened here........
From this........

To this...... :)
It was a long day. They started tearing down the porch around 10am. Between a few rain storms they were able to get this down by 7pm and hauled away. Well not completely away. Part of the room is still sitting in the driveway.
Dave called the foundation guy to find out when he will be coming out. He said earlier in the week that it wouldn't be until the end of next week. Dave called today to confirm a date and he said as soon as you have it dug I will be out!!! Can you say quick! Dave then called the excavator to find out when he could come. Had he had a set of keys it would of been yesterday!! Thankfully he's coming on Tuesday. Then the foundation guy will follow.
Will have more pictures coming soon.
Friday, June 6, 2008
Our First Addition
Our current house has about 2,000 sq ft. We are going to add on an additional 2,100 sq ft with a basement. The basement will be 1,092 sq ft of full basement and 1,008 sq ft of crawl space. We are doing most of the work ourselves. At this point in time we are hiring in for foundation and excavation. The rest will be done with our family and any help that wishes to join us.
With this addition we will be adding 5 bedrooms, 1 bathroom, 1 mud room, 1 laundry room, 1 dining room & family room combo. Then there is 1 room yet we haven't figured out what it will be. Downstairs in the basement we are hoping to make that a living room also. So in the summer time we have a place to cool off and not use the a/c.
Any questions?